Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 6 results ...
Cuervo, J C and Pheng, L S (2003) Significance of location factors for Singapore transnational construction corporations. Engineering, Construction and Architectural Management, 10(05), 342–53.
Fernie, S, Green, S D and Weller, S J (2003) Dilettantes, discipline and discourse: requirements management for construction. Engineering, Construction and Architectural Management, 10(05), 354–67.
Hughes, W (2003) A comparison of two editions of the RIBA Plan of Work. Engineering, Construction and Architectural Management, 10(05), 302–11.
Ruthankoon, R and Ogunlana, S O (2003) Testing Hertzberg's two-factor theory in the Thai construction industry. Engineering, Construction and Architectural Management, 10(05), 333–41.
Singh, A (2003) Accelerated work-schedule design considering efficiency losses for overtime and overmanning. Engineering, Construction and Architectural Management, 10(05), 312–21.
Xiao, H and Proverbs, D (2003) Factors influencing contractors performance: an international investigation. Engineering, Construction and Architectural Management, 10(05), 322–32.